In partnership with Instavolt, the UK’s largest rapid EV charging network, Lucy Zodion and Lucy Electric teamed up to provide an end to-end infrastructure solution at Taurus Crafts in Gloucestershire The core solution comprised a feeder pillar and package substation. The pillar, serving six 160kW chargepoints, incorporated earth leakage, residual current and surge protections, as well as provisions for metering, anti-condensation heaters, and service lights for enhanced safety and user experience. The 500kVA package substation seamlessly integrated medium and low-voltage power distribution, while ensuring efficiency and compliance with industry standards. The end result not only guaranteed dependable charging performance and user satisfaction, but allowed for future scalability.

500kVA Package substation

800A Feeder pillar

Serving 6 160kW chargepoints

22

|

Lucy Group Ltd Annual Report & Accounts 2024

LUCYGROUP.COM

|

23

Made with FlippingBook - Online Brochure Maker